What Is BNA Vision and How Has It Changed the Airport?
- 3 sections
- 2 tables
- 7 sources cited
BNA Vision was the Metropolitan Nashville Airport Authority’s $1.5 billion program to enlarge Nashville International Airport, and its main results are the Grand Lobby with a 24-lane security checkpoint (opened January 2023), a satellite concourse reached by shuttle (opened February 2024), and the on-airport Hilton hotel (March 2024). It has been followed by a second, $3 billion program called New Horizon, which added the Concourse D extension in 2025 and is rebuilding Concourse A for a July 2028 opening. For a traveler, the lobby, the checkpoint, and several concourses are new since the mid-2010s, and parts of the airport are still under construction.
What BNA Vision Built
| Project | Opened | What it changed |
|---|---|---|
| Grand Lobby and central terminal | January 2023 | 24 security screening lanes, a food and retail marketplace, and art installations, in a $480 million project |
| Satellite concourse | February 2024 | 8 gates and 7 concession spots, reached by shuttles that run every three minutes, 24 hours a day |
| Hilton BNA hotel | March 2024 | an on-airport hotel beside the terminal |
Sources: Airport Improvement, May 2023 (Grand Lobby, $1.5 billion program total); WSMV, February 2024 (satellite concourse, which with its shuttles cost more than $150 million); Wikipedia (hotel opening and the program’s other parts, including a new international arrivals facility and parking garages).
The program grew out of passenger growth. At the satellite concourse opening, airport authority president and CEO Doug Kreulen said the airport had set passenger records 11 years in a row and expected to finish fiscal year 2024 at about 24 million passengers, up from 21.9 million the year before.
New Horizon: The Program That Followed
| Step | Date | Detail |
|---|---|---|
| Concourse D extension | opened to travelers July 8, 2025 | five new gates, all operated by Southwest Airlines, new restaurants and shops, a moving walkway, and the airport's first outdoor terrace |
| Concourse A closes | September 24, 2025 | the old concourse was closed for demolition and reconstruction |
| Central Core renovation | through December 2027 | a $40 million rework of entrances, elevators, and escalators; the Level 5 pedestrian bridge from the terminal garages is closed, so garage parkers enter the terminal on Level 1 |
| Rental car facility and garage | under construction | planned for 4,700 rental vehicles and 3,000 parking spaces |
| New Concourse A | expected July 2028 | 16 gates and two moving walkways; BNA says it will be the airport's largest concourse |
Sources: WSMV, July 2025, WSMV, September 2025, and WSMV, August 2026. Kreulen said in July 2025 that the new Concourse A would take the airport from 54 gates to 70. The airport authority describes New Horizon as preparing BNA for as many as 40 million passengers a year; in the fiscal year that ended June 30, 2026, it handled 26.7 million.
What It Means When You Fly Through BNA Now
- Security is in the Grand Lobby. Screening happens at the 24-lane checkpoint BNA Vision built.
- Some gates need a shuttle. Gates C4 to C11 are in the satellite concourse (Wikipedia), reached by shuttle rather than on foot, so leave a few extra minutes if your boarding pass shows one of them.
- Concourse A is not there. Until the new concourse opens, flights use the other concourses; check your gate on the day rather than relying on a past trip.
- Garage parkers use Level 1. While the Central Core work continues, the path from the terminal garages into the terminal is on Level 1.
- Cars enter through Terminal Garage 2. Since October 20, 2026, the Terminal Garage 1 entrance and exit are closed for the rental car facility and garage construction, and drivers reach both garages through Terminal Garage 2 (WSMV).
A walk-through of the terminal layout, from the curb to the gate, is in whether BNA is easy to navigate.